From: route@monster.com
Sent: Saturday, April 16, 2016 2:05 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: NSN Construction Manager
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
William M. (Mike) Besecker 10647 Lessona St Las Vegas, NV (702) 265-8505 MBesecker06@hotmail.com SUMMARY: Local
wireless manager with more than 20 years of Cross-functional experience. ·
4G
LTE/ 2G / 3G UMTS, fiber to site. Construction Manager, Decommission sites.
RRUs. RETs. ·
Experienced
in handling multiple subcontractors on multiple job sites. OSHA 10 safety
trained. ·
Ensure
project schedules are accurately forecasted from site acquisition &
engineering through construction complete. EDUCATION AND TRAINING: U.S.
Army - 22 Years Retired, Sergeant First Class ·
Microwave
Telecommunications Electronics Training ·
Organizational
Management - Platoon Sgt, M/W Station Chief, S2 NCOIC, ·
Logistics
Training ·
Secret
Security Clearance (Inactive) ·
International
Deployments - Germany (7 yrs.) Korea (2 yrs.) ·
Desert
Shield / Desert Storm - Ryhad, Saudi Arabia ·
OSHA
10 hr- General Industry (1926) Safety & Health, Ericsson, 2012 ·
Tower
Technology Training, MFS Network Technologies, 40 Hours, 1996 ·
U.S.
Army - Electronic Maintenance Schools, Leadership University
of Maryland, general curriculum PROFESSIONAL EXPERIENCE: Ericsson/ Century Link, Las Vegas NV May 2015 to Oct. 2015 Project Manager ·
Supervised
GCs installing Century Link fiber to the curb, FTTC. ·
Coordinated
the utility services and city inspectors, resolving home owner issues. ·
Verified
as-builds, workmanship onsite inspections and through CAM. ·
Performed
site acceptance walks with Century Link Ericsson/ Verizon, SC/NC Sept. 2014 to May 2015 Construction Manager ·
Managed
contractor’s construction Ericsson/ Verizon AWS 2100, PCS1900, LTE 700,
850 ·
Developed
SOW and ordered BOMs. ·
Performed
QC/QA Inspections, final punch, site acceptance walks. ·
Coordinated
Virtual Punch Walks ·
Ericsson's
database Site Handler Mycom/ Xerox, LA, CA May 2014 to July 2014 Market Lead for General Contractor ·
Prepared
and managed plans, scheduled construction managers / tower crews, assigned
support personnel and funding for awarded projects. ·
Developed
and maintained a tracker to actually show schedules, process, man-hours and
funding for each project. ·
Reviewed
resumes and conducted hiring interviews. Established and wrote monthly
personnel work performances. Performed personnel disciplinary action reviews
and terminations when required. ·
Reviewed
each site work package with construction manager and crew lead to insure SOW,
Scope of Work, was understood. Insured construction manager have all material
required to complete site SOW. Followed up any clarifications or material to
complete SOW. ·
Attended
daily status meets with Mycom project manages. ·
Chaired
daily morning meeting with construction managers. Site status, crew
assignments and safely topics. ·
Reviewed
construction managers’ daily reports and crew time sheets. ·
Supervised
admin, warehouse and close out personnel. ·
Conducted
site visits. Preformed safely reviews. Verified site personnel understood
SOW. Bechtel/ AT&T, San Ramon CA July 2012 to May 2014 Field Coordinator ·
Scheduled
and supervised GCs for structural modification SOW and LTE / 2C / 3C / 5C
& UMTS 2C ·
Reviewed
construction, structural modification drawings, RFDS to develop Structural
bid packages to submit for a bid request to general contractors. ·
Processed
Environment Trigger Checklist, Phase 2, Phase 3 documentation. ·
Completed
required documents of environmental abatements. ·
Processed
POs for structural mods, inspections and building permits. ·
Maintained
process tracker and Bechtel's WIZ data base. Networkers Telecom/ Ericsson/ Sprint, Kansas City,
KS Feb. 2011 to July 2012 Construction Project Manager ·
Supervised
the construction of 98 LTE / CDMA sites. ·
Coordinated
and conducted Alternate Access Vendor, AAV (fiber to site), site walks with
AT&T, COX and TWC. ·
Interfaced
with RF engineers, Real Estate Associates, A&E firms, landlords and
structural engineers from project start to completion. ·
Forecasted
construction milestones (Site Handler). ·
Reviewed
90% / 100% zoning and construction drawings ·
Initiated
POs, ordering BOMs and developing out of scope SOWs ·
Ericsson
6102, RRU, Microwave. Sprint Siterra ·
Ericsson's
data base Site Handler/ WATTs/ Einstein Kineticom/ Verizon, New Orleans, LA June 2010 to Feb. 2011 Project Manager ·
Supervised
the BTS RIP of 700 sites and total decommissioning of 350 of Verizon and
Alltel cell sites. ·
Coordinated
dismantling towers, removal of BTS, generators, DC power plants, batteries,
equipment platforms, antennas and coax. ·
Coordinated
SOW with Landlords, Site Acquisition, Transport and General Contractors. ·
Maintained
decommissioning tracker, updating Environmental Management Information System
data base. ·
Processed
POs, invoices, recovered equipment and closeout documentation. ·
Defined
SOW. Requested GC quotes. Tracked quotes, POs. ·
Created
Excel spread sheet to track site process. To include equipment on site,
equipment removal, disposition for equipment. ·
Conducted
SOW kick off meeting with contractors. ·
Daily
face to face status meeting with Verizon management. T-Mobile / Celcite, Louisville, KY Oct. 2009 to June 2010 Construction Project Manager- AAV/ DAS ·
Supervised
contractor construction of 63 UMTS T-Mobile sites. ·
Supervised
construction of Alternate Access Vendor, AAV, Ethernet, fiber to site, 272
sites in Louisville KY, Nashville & Knoxville TN. ·
Coordinated
AAV site surveys with AT&T Engineers. ·
Coordinated
SOW with T-Mobile Site Development, Ops Manager and managing five general
contractors. ·
Developed
SOW and ordered BOMs. ·
Performed
QC/QA Inspections, final punch, site acceptance walks. ·
Nokia
UMTS Node B, AT&T CENIA 3911 equipment. ·
T-Mobile's
Box.net. ·
Created
PowerPoint showing AAV SOW, placement of AAV CENIA and additional equipment. ·
Developed
Excel spread sheet to track UMTS and AAV projects. ·
Developed
AAV QC checklist. ·
Worked
with AT&T engineer, TMO Ops Manager and site techs to identify project
issues and developed solutions. ·
Daily
face to face process meeting with TMO Ops Manager. Weekly
conference call with PMs. Daily status calls with CGs. ·
Onsite
training with PowerPoint presentation with GC crews ensuring SOW and
specifications were maintained. ·
Perform
site walks with cell site land owners, Sprint, Crown Castle, Verizon, to
ensure proposed construction drawings were approved and accurate. ·
Developed
and maintained tracker for change orders, finance submittals and approvals. T-Mobile / AirCom International, Las Vegas, NV April 2009 to June 2009 Construction Manager ·
Supervised
contractor construction of T-Mobile sites. ·
Reviewed
and processed UMTS close-out packages. ·
Performed
QC/QA Inspections, final punch, site acceptance walks. Ericsson / AirCom International, San Francisco, CA July 2006 to April 2009 Construction Project Manager ·
Managed
contractors construction of 300 Ericsson/AT&T 850/1900, 1st & 2nd
carriers UMTS/GSM sites (Turf Drivers, SRM) ·
Ericsson
UMTS equipment, 3106, 3206, 3418, 3518 RRUs. RETs ·
Developed
and ordered BOMs (Hutton) ·
Forecasted
construction milestones (Site Handler) ·
Conducted
bid walks, estimated job cost for change orders and Out of Scope Work ·
Processed
change orders (FABs,Watts) ·
Reviewed
and processing UMTS close-out packages (Siterra) ·
Coordinated
and managed vendors, performed QC/QA Inspections, final punch, site
acceptance walks. ·
Conducted
RET inspections, download and reviewed CCU reports. ·
Conducted
site surveys ·
Developed
outline with Power Point and conducted kick off meeting. ·
AT&T's
data base Siterra Alcoa Wireless Services, Atlanta, GA Sept. 2005 to July 2006 Project Manager ·
Managed
Cingular/Bechtel UMTS sites in Orlando, FL ·
Managed
Sprint new and co-location builds in Orlando, FL ·
Managed
Cricket/ANB co-location builds in Louisville, KY ·
Responsible
for tracking construction milestones. Maintained cost tracking, reviewed and
processed change orders. Estimated job cost for In Scope and Out of Scope
work. ·
Conducted
site surveys and coordinated cranes operations. ·
Managed
one to three civil and tower crews. ·
Completed
as-built drawings, close-out packages, prepared punch list and conducted
final inspections. General Dynamics, Las Vegas, NV Jan. 2005 to Sept. 2005 Construction Manager ·
Managed
180 Cingular growth and overlay projects. ·
Responsible
for tracking construction milestones. Maintained cost tracking, reviewed and
processed change orders. ·
Liaison
between Lucent (UMTS), Nokia (GSM) and sub-contractors for site BTS, T1
installations, antenna and line construction. ·
Interfaced
with RF engineers, Real Estate Associates, A&E firms, landlords and
structural engineers from project start to completion. ·
Coordinated
microwave path alignments, COW deployments with Network Operations Personnel
and MOPs. ·
Prepared,
submitted and tracked material list, BOMs, with vendors. Andrews, Tessco,
Commscope. Wireless
Facilities, Inc., Pueblo CO Nov.
2003 to July 2004 Project
Manager ·
Managed
46 sites for Western Wireless CDMA/GSM Overlay Project to include site
design, preparing bid packages, supervising tower crews and I&C
personnel. ·
Maintained
databases, produced daily and weekly status reports. ·
Ordered
BOMs, written Scopes of Work. ·
Completed
as-built drawings, close-out packages, prepared punch list and conducted
final inspections. ·
Performed
Warehouse Manager duties. US
Dept. of Homeland Security, Transportation Security Administration, Will
Rogers Airport, OKC Sept.
2002 to Nov. 2003 Transportation
Security Screener ·
Performed
a variety of duties providing security and protection for air travelers and
aircraft. ·
Operation
of electronic detection and imaging equipment. Mercury
Communications, MO Sept.
2001 to June 2002 Estimator
and Project Manager ·
Managed
the construction of Sprint, Nextel, Voice Stream, SBA and American Tower
wireless sites in OK, TX, MO and KY. ·
Attended
bid walks, estimated job cost for new sites and mods, coordinated and
qualified local sub-contractors. ·
Ensured
compliance by the construction/tower crews and sub- contractors for safety,
quality, timeline and profitability. TNT
Wireless, OK Feb.
2001 to Aug. 2001 Project
Manager ·
Supervised
the installation of 85 Nortel Metrocell radio base stations for Sprint. ·
Designed
and produced layout configurations for modifications to existing cell sites. ·
Supervised
8 technicians, 1 warehouse laborer. ·
Managed
15,000 sq. ft. warehouse and inventory ·
Developed
basic material list, verified purchased orders and maintained inventory
accountably. ·
Maintained
databases, produced daily and weekly status reports. Trinity
Wireless Services, Irvine, TX July
2000 to Jan. 2001 Project
Manager ·
Supervised
construction of 45 cell sites. Sprint, Voice Stream, AT&T Wireless sites. ·
Performed
QA/QC reviews for the installation of site compounds, towers, antennas, coax,
weatherproofing, grounding, T-1/POTS and power. ·
Coordinated
delivery and offloading of towers, generators and shelters. ·
Conducted
ground resistance testing and coax line sweeps. Reviewed and processed all
documentation. ·
Maintained
cost tracking, reviewed and processed change orders. ·
Coordinated
microwave path alignments, COW deployments with Network Operations Personnel
and MOPs. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||